Case studies
Results by utility type.
Each study runs one Evardi agent on a network built like yours and shows how the result was reached.
Utility type
Agent

61%of inspections find a real problem, vs 6% from billing flags
A meter's view of 109 transformers, with no transformer meters
Read case study →
60%of switching errors caught before the field
Every intermediate switching step checked, review time halved
Read case study →
42%fewer unsafe switching actions in storm drills
More members restored per switching step, with every step checked
Read case study →
Fewer extension dayson a generating unit, priced at its replacement power
Fewer extension days on a generating unit, priced at its replacement power
Read case study →
10 minper transfer question, down from 2 hours
Every cutover checked for transfer capacity, without a consultant study each time
Read case study →
4 hoursper plant, down from about 120
An auditable extreme-cold temperature in hours instead of weeks
Read case study →
Every meter checkedautomatically, each time a line is re-energized
Hurricane restoration: the meter-data side, automated
Read case study →
60%of overload failures flagged a year or more ahead
Every transformer's load at 2, 5 and 10 years, before EVs and solar arrive
Read case study →
Customers kept onthrough a neighboring line when their own is shut off
Customers kept on through a neighboring line when their own is shut off
Read case study →
80%of requests cleared as routine
Every reclose-off request checked against live switching and crew authorization
Read case study →
1 hourto a confirmed cause, down from 4
From a unit trip to a confirmed cause in an hour, with the report drafted
Read case study →
* Studies simulated with partners on public data.