60%of switching errors caught before the field

The problem

A large utility writes tens of thousands of switching orders a year. Each is checked by a second person reading it line by line, and the checks that matter most (load at every intermediate step, a missing closure, the wrong device or tag) are the hardest to see on paper. When a switch fails mid-procedure, there is rarely a written fallback.

What we ran

A large distribution network model, a year of routine and complex orders, and planted failure modes taken from operators: a missing closure, the wrong device or tag, an intermediate overload, cut jumpers and loop normal-opens.

What the agent did

It drafts routine orders from topology and past orders, runs load flow at every intermediate step against the utility's limits, and writes a fallback for each switch that could fail to operate. The dispatcher owns every order. Complex orders go to a person with the reasons.

Results

MeasureTodayWith Evardi
Errors that get past the second check5 a year reach the field2 a year (60% caught)
Minutes to review a routine order126
Intermediate steps load-checkedSpot checksEvery step

What it is worth

* Study simulated with partners on public data.

Run it on your network

Last year's switching orders as a CSV, plus the feeder model. We return every order re-checked step by step, with the problems it found.

Book a demoSee Switching on the platform

Full study

Request the full study.

The complete write-up of “Every intermediate switching step checked, review time halved”: method, data, results and assumptions, as a PDF. Leave your work email and we'll send it.