← All case studies

Case study 6

An auditable extreme-cold temperature in hours instead of weeks

A generator owner · Cold-weather calculation (NERC EOP-012)

A power plant beside a river in winter

4 hoursper plant, down from about 120

The problem

NERC's cold-weather standard EOP-012 asks every generator owner to calculate an extreme cold weather temperature for each plant from years of hourly weather data. Today an engineer assembles it by hand over several weeks, filling gaps in station data, and the result is hard to reproduce for an auditor.

What we ran

No network simulation is needed. The test is a plant's own documents: the agent must reproduce the number the plant engineer calculated by hand, from public weather station data.

What the agent did

It pulls hourly temperatures from nearby public weather stations, normalizes timestamps, fills gaps with a documented method, computes the required percentile of winter hours, and assembles the evidence package. The compliance engineer reviews and signs.

Results

MeasureTodayWith Evardi
Engineer hours per plant per calculationAbout 120About 4
Same inputs give the same answerDepends on who ran itEvery run
Gaps and fills documented for the auditorPartlyEvery one

What it is worth

* Study simulated with partners on public data.

Run it on your network

Plant locations and the documents behind the last hand calculation. We return the reproduced temperature with its full evidence trail.

Book a demo

Full study

Request the full study.

The complete write-up of “An auditable extreme-cold temperature in hours instead of weeks”: method, data, results and assumptions, as a PDF. Leave your work email and we'll send it.