Every cutover checked for transfer capacity, without a consultant study each time

A municipal utility, distribution only · Load transfer table

Power lines along a city street

10 minper transfer question, down from 2 hours

The problem

A municipal utility in a multi-year voltage conversion asks the same question hundreds of times: if this goes out on Tuesday from 9 to 3, can the neighboring ties carry the load? Each answer takes an engineer about two hours, and the harder ones go to outside consultants. When the answer is uncertain, a capacity project gets built early.

What we ran

A year of hourly load on a municipal distribution model, with transfer questions across seasons and hour blocks. Every agent answer was graded against a full load-flow run.

What the agent did

It precomputes, for every station and feeder, how much load the ties can pick up by season and hour block under the utility's limits, refreshed from SCADA history. The operator asks the question and gets the answer, the switching path and the binding limit. Engineers keep the final call.

Results

MeasureTodayWith Evardi
Minutes per transfer question12010
Outside studies for routine transfersSent to consultantsNone needed
Capacity projects built early for lack of an answerBaselineDeferred when the ties can carry the load

What it is worth

* Study simulated with partners on public data.

Run it on your network

The feeder model, a year of SCADA or historian load, and the utility's loading limits. We return the transfer table for one substation area.

Book a demoSee Switching on the platform

Full study

Request the full study.

The complete write-up of “Every cutover checked for transfer capacity, without a consultant study each time”: method, data, results and assumptions, as a PDF. Leave your work email and we'll send it.